Deep Lynx: Digital Engineering Integration Hub

John W. Darrington, Jeren M Browning, Christopher Ritter · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2020

The construction of megaprojects has consistently demonstrated challenges for project managers in regard to meeting cost, schedule, and performance requirements. Megaproject construction challenges are common place within megaprojects with many active projects in the United States failing to meet cost and schedule efforts by significant margins. Currently, engineering teams operate in siloed tools and disparate teams where connections across design, procurement, and construction systems are translated manually or over brittle point-to-point integrations. The manual nature of data exchange increases the risk of silent errors in the reactor design, with each silent error cascading across the design. These cascading errors lead to uncontrollable risk during construction, resulting in significant delays and cost overruns. Deep Lynx allows for an integrated platform during design and operations of mega projects.

Read the paper · More papers on PaperTik