Adapting classical Systems Engineering to Department of Energy (DOE) needs

Lockheed Idaho Technologies Co., Idaho Falls, ID (United States), USDOE, Washington, DC (United States) · 1996

Rather than discuss Systems Engineering (SE) as applied by aerospace contractors to military programs, this document provides an adapted model well suited for use by DOE and represents 18 months of applying SE principles to the challenges faced by INEL. The real-life examples are drawn from INEL`s ongoing effort to integrate activities across the entire spectrum of within its Environmental Management program. Since the traditional SE process, with its initial focus on requirements identification and analysis, must be modified to provide tangible results in the short term, the adapted SE model starts with the external driver of ``reducing costs without increasing risks`` and performs an initial integration effort to identify high-potential, cost-saving opportunities. Elements from traditional alternatives development and analysis stages are used; then the adapted model cycles back to include more traditional requirements analysis activities. These cycles continue in an iterative manner, adding rigor and detail at each successive iteration, throughout the life-cycle of a program or project. Detailed lessons learned are included.

Read the paper · More papers on PaperTik