Survey and alignment report on the primary control network for the APS

IL (United States) Argonne National Lab., Horst W. Friedsam, USDOE, Washington, DC (United States) (US), M Penicka, S Zhao · 1993

During November 1992 the survey and alignment team measured the entire primary control network for the APS. This task had to be finished before the enclosure of the EAA and the RF buildings were put in place, inhibiting several lines of sight necessary for the determination of the monument locations.

Read the paper · More papers on PaperTik