Cutting the Unnecessary Deadlines in EDF

Enrico Bini · 2019

Together with Fixed Priority Scheduling, Earliest Deadline First (EDF) is the second leg on top of which a large portion of the research on real-time systems stands. At the heart of the EDF exact schedulability test, a pivotal role is played by the demand bound function test, which requires to evaluate whether the amount of work required to complete a set of jobs is less than or equal to the amount of time available. Such a test is checked over a set of time instants. In this paper, it is proposed a method that cuts drastically the set of constraints to be checked. Such a method is applicable also to tasks with release offset. Notably, it is proved that such a reduced set of constraints is minimal: it is not possible to reduce the set any further without losing the sufficiency of the test. The code to make this reduction is publicly available on GitHub.

Read the paper · More papers on PaperTik