Study of ISMLink Production Test in EM Shielded Test Fixture

Xin Geng · 2006

A novel test methodology for ISMLink production test that provides several different levels of testing from a single test is presented in the paper. This paper provides helpful information to use both before and during the creation of test hardware and software. It includes test philosophies, instrumentation requirements, testing level, testing components and configuration for ISMLink production test. This paper also contains measured values and recommendations that should be followed in an effort to get the ISMLink production test environment operational.

Read the paper · More papers on PaperTik