Managing Requirement Changes in Health Informatics Projects

Rand Obeidat · International management review · 2016

[Abstract] Several studies have concluded that requirement changes are one of the major problems that have an effect on project environments. Furthermore, requirements could not be stabilized, and change is unavoidable and inevitable. As a result, requirement changes should be managed and controlled in a proper way in order to minimize their consequences. Therefore, this paper investigates the main aspects of Managing Requirement Changes (MRC) in the context of Health Informatics (HI) projects based on a conceptual framework and shows the relationship between these aspects after conducting interviews with four IT health professionals.

Read the paper · More papers on PaperTik