Overview of the ARISE project
E.A. den Os, Lou Boves, Lori F Lamel, Paolo Baggia · 1999
The LE-3 project ARISE (Automatic Railway Information Sys-tems for Europe) ran from October 1996 through December 1998. Four prototypes of train timetable information systems for three different languages were developed, tested, and validated: Italian (based on technology developed by CSELT), French (two systems, one based on Philips technology, the other on