Prediction Model of Overhaul Man-hour of Electronic Equipment Based on Power-exponent

Wenfeng Wang · Equipment Environmental Engineering · 2012

Along with the coming of equipment overhaul period,aimed at the man-hour forecast problem of equipment overhaul,based on power-exponent theory,a prediction model of overhaul man-hour of electronic equipment was build according to overhaul flow of the equipment.The flow was three phases,which were disassembly phase,complete repairing phase,and assembling and debugging phase.The result of examples indicated that the model is rational and maneuverable;it meets the requirements of making detailed overhaul scheming.

Read the paper · More papers on PaperTik