Application of a new type fascine - cage fascine to training works for Yellow River
Baoqiang Xu · Water Resources and Hydropower Engineering · 2005
The structure and the construction method of a new type of fascine are introduced herein, of which the advantages are as the follows. (1) The shortages of the complicated construction process and low construction progress with low efficiency are o-vercome. (2)The fascine cage can be industrially made,so as to reduce the working procedure in site. (3)The heavy construction equipments can be used for the mechanical construction of the single large size fascine cage with high construction speed and intensity. (4) It is favorable to the environment protection as the amount of the fascine material being decreased. Base on the application to Caiji training works in Lankao county, the construction procedure consisting of the preparation and the construction combined with the mechanical equipment is further described for the technique, and then some key points necessary to be reminded during the construction are summarized as well. At last the benefit evaluation is made and an idea to enlarge the application with the water tank test is put forward.