On the AHP of the Tunnel Blasting Plan Optimized

Lei Jing · Journal of Yangling Vocational & Technical College · 2008

The authors mainly analyzed the four factors influencing the total cost of the tunnel blasting project: the drilling cost,the blasting cost,the loading cost and the transportation cost,focusing on the practical problem of the optimized total cost of the tunnel blasting.Then the authors carried on the analysis proof through hierarchy analysis method with an engineering example and put forward a corresponding optimized plan,which provides a reference to reasonably exploring the total cost optimization of the tunnel blasting and solving the cost optimization in the current construction units.

Read the paper · More papers on PaperTik