Substation locating optimization based on risk analysis

Rui Fang · Journal of North China Electric Power University · 2011

To take into account the impotence of the uncertainty risk in the substation location,the benefit optimization model is taken and the influence of uncertainty risks in substation location are evaluated and analyzed,then the maximum benefits in substation location are calculated based on considering the uncertainty risks.Case study shows that the model combined with transformer track cost,transformer project cost and transformer expected profit,considering the uncertainty risks the result,is feasible in theory and is credible in calculation.

Read the paper · More papers on PaperTik