Study on proper design method for cut-through survey of tunnel

Hao Yong-hu · Shanxi Architecture · 2009

From three aspects,the characteristics of common construction methods and survey work of tunnel engineering,rational layout of control network for cut-through survey of different tunnels and error distribution in cut-through survey rational design plan for cut-through survey of tunnel is studied.Through comparative analysis rational error distribution proportion is determined so as to set rational plan for cut-through survey in technical economy.

Read the paper · More papers on PaperTik