Development and application on computer-aided system of tunnel construction risk analysis and evaluation
Liu Baogu · Journal of Beijing Jiaotong University · 2015
The function of computer-aided system of tunnel construction risk analysis and evaluation and its implementation method have been introduced. This system includes the foreground applications and the background risk database. It integrates fuzzy network analysis method for the first time to conduct risk assessment. Besides,risk assessment report can be generated and a variety of ways have been provided to realize search function. In addition,it has achieved the risk management of tunnel construction from risk identification,risk estimation,risk assessment to risk decision-making with computer programs. By conducting the risk management of Hu Maling Long Tunnel with the system,the effectiveness of the system has been demonstrated,which has a positive meaning to enhance the risk management of tunnel construction.