Design and construction of large floating operational platform in the tide reach section of river

Yan Chang-chu · Shanxi Architecture · 2006

According to the engineering features of the main tower of the third bridge of Feiyunjiang the construction plan is proposed for drilling platform.Detailed introduction is made for design calculation as well as final plan.Practical construction is introduced,which provides good references for similar works.

Read the paper · More papers on PaperTik