Modelling and Optimisation of Deviation in Hydro Power Production

Dietmar Winkler, Hege Marie Thoresen, Ingvar Andreassen, M. Anushka S. Perera, Rahimi Behzad Sharefi · Linköping electronic conference proceedings · 2011

In 2009 a new price system for the produced power was introduced for Norwegian hydro power plants.Basically a power producer gets punished if his production deviates from the scheduled production.The power plant is paid for the actual production: if too much power is produced that the price for the excess power is low.Even worse if too little power is produced the power plant has to pay a fine.If such deviation occurs it is very important to identify components/systems that are responsible in order to adjust the controller or replace the faulty equipment.This paper describes the first step in problem solving, by presenting the development of a model of a hydro power plant that shows differing power production.The modelling part was done in Modelica R using the HydroPlant Library 1 of Modelon AB.The model was parametrised using construction data and validated using data from test and operation runs.

Read the paper · More papers on PaperTik