Multi-layer Bus Optimization for Real-Time Task Scheduling with Chain-Based Precedence Constraints

Pi-Cheng Hsiu, Der-Nien Lee, Tei‐Wei Kuo · 2009

One major challenging issue in the designs of multi-core embedded systems is to tackle the communication problem among tasks with performance requirements and precedence constraints. This paper targets the problem of scheduling real-time tasks with chain-based precedence constraints over multi-layer bus systems with an objective to minimize the bus cost. We show the NP-hardness of the problem and the best possible approximation ratio of approximation algorithms. A polynomial-time optimal algorithm is first proposed for a restricted case in which one multi-layer bus and unit execution and communication times are considered. The result is then extended as a pseudo-polynomial-time optimal algorithm in the considerations of multiple multi-layer buses and arbitrary execution and communication times. The capability of the proposed algorithm was evaluated to provide more insights in system designs, compared to some popular heuristics.

Read the paper · More papers on PaperTik