Surface moisture measurement system hardware acceptance test procedure

Westinghouse Hanford Co., Richland, WA (United States), Greg A Ritter, USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States) · 1996

The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

Read the paper · More papers on PaperTik