Job scheduling in a partitionable mesh using a two-dimensional buddy system partitioning scheme

K. Li, Kam-Hoi Cheng · IEEE Transactions on Parallel and Distributed Systems · 1991

The job scheduling problem in a partitionable mesh-connected system in which jobs require square meshes and the system is a square mesh whose size is a power of two is discussed. A heuristic algorithm of time complexity O(n(log n+log p)), in which n is the number of jobs to be scheduled and p is the size of the system is presented. The algorithm adopts the largest-job-first scheduling policy and uses a two-dimensional buddy system as the system partitioning scheme. It is shown that, in the worst case, the algorithm produces a schedule four times longer than an optimal schedule, and, on the average, schedules generated by the algorithm are twice as long as optimal schedules.>

Read the paper · More papers on PaperTik