Selecting and implementing the PBS scheduler on an SGI Onyx 2/Orgin 2000.
Stefan Bittner · University of North Texas Digital Library (University of North Texas) · 1999
In the Mathematics and Computer Science Division at Argonne, the demand for resources on the Onyx 2 exceeds the resources available for consumption. To distribute these scarce resources effectively, we need a scheduling and resource management package with multiple capabilities. In particular, it must accept standard interactive user logins, allow batch jobs, backfill the system based on available resources, and permit system activities such as accounting to proceed without interruption. The package must include a mechanism to treat the graphic pipes as a schedulable resource. Also required is the ability to create advance reservations, offer dedicated system modes for large resource runs and benchmarking, and track the resources consumed for each job run. Furthermore, our users want to be able to obtain repeatable timing results on job runs. And, of course, package costs must be carefully considered. We explored several options, including NQE and various third-party products, before settling on the PBS scheduler.