Constructions of permutation arrays for certain scheduling cost measures

Joseph Seffi Naor, Ron M. Roth · Random Structures and Algorithms · 1995

Abstract Constructions of permutation arrays are presented that are optimal or nearly‐optimal with respect to two cost measures: the so‐called longest‐jump measure and the longest‐monotone‐greedy‐subsequence measure. These measures arise in the context of scheduling problems in asynchronous, shared memory, multiprocessor machines.

Read the paper · More papers on PaperTik