CH2M Hill Hanford Group, Inc. Standards and Requirements Identification Document (SRID) Requirements Management System and Requirements Specification
Adriana Johnson · 2000
The current Tank Farm Contractor (TFC) for the U. S. Department of Energy, Office of River Protection (ORP), River Protection Project (RPP), CH2M Hill Hanford Group, Inc. (CHG), will use a computer based requirements management system. The system will serve as a tool to assist in identifying, capturing, and maintaining the Standards/Requirements Identification Document (S/RID) requirements and links to implementing procedures and other documents. By managing requirements as one integrated set, CHG will be able to carry out its mission more efficiently and effectively. CHG has chosen the Dynamic Object Oriented Requirements System (DOORS{trademark}) as the preferred computer based requirements management system. Accordingly, the S/RID program will use DOORS{trademark}. DOORS{trademark} will replace the Environmental Requirements Management Interface (ERMI) system as the tool for S/RID data management. The DOORS{trademark} S/RID test project currently resides on the DOORSTM test server. The S/RID project will be migrated to the DOORS{trademark} production server. After the migration the S/RID project will be considered a production project and will no longer reside on the test server.