Exploiting a Graphplan framework in temporal planning

Derek Long, Maria Fox · Strathprints: The University of Strathclyde institutional repository (University of Strathclyde) · 2003

Graphplan (Blum & Furst 1995) has proved a popular and successful basis for a succession of extensions. An extension to handle temporal planning is a natural one to consider, be-cause of the seductively time-like structure of the layers in the plan graph. TGP (Smith & Weld 1999) and TPSys (Gar-rido, Onaindı́a, & Barber 2001; Garrido, Fox, & Long 2002) are both examples of temporal planners that have exploited the Graphplan foundation. However, both of these systems (including both versions of TPSys) exploit the graph to rep-resent a uniform flow of time. In this paper we describe an alternative approach, in which the graph is used to repre-sent the purely logical structuring of the plan, with tempo-ral constraints being managed separately (although not inde-pendently). The approach uses a linear constraint solver to ensure that temporal durations are correctly respected. The resulting planner offers an interesting alternative to the other approaches, offering an important extension in expressive power.

Read the paper · More papers on PaperTik