ACTIM: A PSP Activity Timer
T Tom Verhoeff · 2004
This document describes the assignment for the Software Engineering Project (2IP60) in the winter of 2004/’05. It is —on purpose — not presented as a project requirements document, because requirements capture is part of the project.