Surface moisture measurement system acceptance testing work plan

Westinghouse Hanford Co., Richland, WA (United States), Greg A Ritter, USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States) · 1996

This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing.

Read the paper · More papers on PaperTik